October 2017

Solines delivers conductor pipes 610 Ø x 12.7 mm for vertical drilling for geothermal energy

Geothermal energy is heat recovery by extracting geothermal energy from the soil. For a good customer, Solines supplied more than 200 meters of pipes Ø 610 x 12.7 mm. These conductor pipes will serve as protection for the water-bearing layers, so that they do not come into contact with the deeper layers. Conductor pipes of Ø 610 x 12.7 mm Our customer drilled a hole with a diameter of 800 mm to approx. 140 meters below ground level, after which the delivered...

stalen-buispalen-vervangen-de-prefab-betonnen-heipalen-door-solines

Solines supplies steel pipe piles because of supply problems with prefabricated concrete piles.

Several foundation companies are facing a shortage of prefabricated concrete piles. Due to the surge in construction and the aftermath of the economic crisis, in which several producers of concrete piles went bankrupt, the remaining producers can no longer produce enough to meet the enormous demand on time. This results in huge delays and therefore potentially high cost posts. Fortunately, Solines always has the alternative in stock. Several companies have already started looking for steel pipe piles, which are custom-made by Solines and...

Solines supplied more than 5500 meters of pipe of Ø 139.7mm and Ø 152.4mm for Prolock plastic shoring

Quay improvement For the project quay improvement for the Voorvliet and Montfoortse canal, Solines supplied over 5500 meters of pipe Ø 139.7 mm and Ø 152.4 mm These pipe piles are used in combination with 300 meters of Prolock plastic shoring. The plastic screen holds the soil, and the often longer piles ensure the strength and stiffness of the overall structure. Prolock shoring A Prolock shoring has the great advantage that it has a life expectancy of 50 years, which is many times...

February 2017

Piles for a dry dock in Katwijk

A foundation company was commissioned to realize the foundation of a waterproof cellar area in Katwijk. This will function as a dry dock for maintenance of yachts and small vessels. Solines supplied the steel pipes needed for this. 44 pile pipes with a diameter of 273 mm and a length of 17 meters The cellar area, with a depth of four meters, was founded on 44 pile pipes with a diameter of 273 mm and a length of 17 meters. For this...