Tag - Foundation technique

November 2017

Solines-levert-boorbuizen-voor-Erasmus-MC

Foundation technology: customization in drill pipes for Erasmus MC

Drill pipes for Erasmus MC in Rotterdam For the foundation of new construction of the Erasmus MC in Rotterdam, Solines was able to supply drill pipes in January 2016. The pipe piles Ø 457×8 mm with steel grade X60 were made to size according to specifications. They were fitted with grout injection lances. Drill pipes with thinner wall thickness Due to the higher steel quality of X60, a diameter of 457 mm and a wall thickness of 8 mm could be used....

fundering buizen a15

Foundation technique: Pipes along the A15 for the MaVa project

Foundation A15 MaVa project The Rijnmond region is in full development. More and more houses and ports are sprouting up. The A15 is an important link between the port of Rotterdam (from the Maasvlakte), the rest of the country and the Ruhr area. 85 km of additional lanes for the A15 More people and more companies create more traffic on the A15. To make this area safer and more accessible, the stretch of the A15 from the Maasvlakte to Vaanplein (MaVa) is...