Monthly Archives - November 2017

Steel pipes for train washing line in Utrecht

Approximately 350 tonnes of pipes torch-cut to size Solines supplied steel pipes for the foundation of the concrete retaining wall for the new train washing line in Utrecht. Over two phases, we torch cut and delivered a total of approximately 350 tonnes of pipes in the dimension Ø 473 x...

Read more...

Train traffic unhindered due to vibration-free bridge foundation

drilling point The traffic bridge in Denderleeuw in Belgium was in dire need of replacement. The new Kemelbrug had to be placed right next to the existing railway bridge. In order not to hinder train traffic, the vibration-free drilled placement of drill piles for the foundation was requested, with prefab...

Read more...
Solines-levert-boorbuizen-voor-Erasmus-MC

Foundation technology: customization in drill pipes for Erasmus MC

Drill pipes for Erasmus MC in Rotterdam For the foundation of new construction of the Erasmus MC in Rotterdam, Solines was able to supply drill pipes in January 2016. The pipe piles Ø 457x8 mm with steel grade X60 were made to size according to specifications. They were fitted with...

Read more...
fundering buizen a15

Foundation technique: Pipes along the A15 for the MaVa project

Foundation A15 MaVa project The Rijnmond region is in full development. More and more houses and ports are sprouting up. The A15 is an important link between the port of Rotterdam (from the Maasvlakte), the rest of the country and the Ruhr area. 85 km of additional lanes for the A15 More...

Read more...